We required Instrument QC Inspector, Aramco-approved, with CBT-02 No’s
Project Location: Jizan JIGCP
Duration: 6 Months
Documents: Must needed Ajeer (Preferred for JIGCP Approval)
[ Apply at: [javascript protected email address] ]
We required Instrument QC Inspector, Aramco-approved, with CBT-02 No’s
Project Location: Jizan JIGCP
Duration: 6 Months
Documents: Must needed Ajeer (Preferred for JIGCP Approval)