We are looking for an experienced SCAFFOLDING ENGINEER to join our team and provide clients with the highest quality services.
Legal Requirements:
Valid Iqama
Ajeer paper / Kafeel Authority Letter
Required Education and Experience
temporary works procedure which will contain most or all of the following elements:
Appointment of a Temporary Works Co-ordinator (TWC)
Preparation of an adequate design brief.
Completion and maintenance of a temporary works register
Production of a temporary works design (including a design risk assessment and a designer’s method statement where appropriate).
Independent checking of the temporary works design.
Issue of a design/design check certificate, if appropriate.
Pre-erection inspection of the temporary works materials and components.
Control and supervision of the erection, safe use, maintenance and dismantling of the temporary works – ie, procedures to:
Check that the temporary works have been erected in accordance with the design, and issue a formal “permit to load” where necessary.
Confirm when the permanent works have attained adequate strength to allow dismantling of the temporary works, and issue a formal “permit to dismantle” where necessary.
The procedure should include measures to ensure that the design function, the role of TWC, and Temporary Works Supervisor(s) where appropriate, are carried out by competent individuals.
Smaller contractors may not have the experience to operate their own temporary works procedure and may need to obtain external expertise. It is also common for large and medium contractors to outsource aspects of temporary works design and management.
Please note that this is a supplier base job with handsome salary package.
We are not transferring sponsorship.
[ Apply at: [javascript protected email address] ]